Reconstruction of the sewer system of parts of the Absheron and Binagadi districts

Prepare to print

Reconstruction of the sewer system of parts of the Absheron and Binagadi districts

Client: "Azersu" OJSC, Azerbaijan.                                

Performed services:

  • Engineering survey services (topography, geology,geophysics);
  • Hydraulic modelling, simulations etc. via Bentley SewerGEMS;
  • Development of design estimates according to SNiP and AzDTN standards;
  • Preparation of BOQ, technical specifications, development of arrangement of construction project (POS);
  • Environmental impact assessment;
  • Provision of relevant data and documentation required;
  • Obtaining of agreements and opinions with relevant authorities.

Designed scope:

  • sewage network - 317.1 km;
  • sewage collector - 25,3 km;
  • microtunnel - 7,5 km;
  • sewage pump station - 3 un.