Reconstruction of Qabala city's drinking water supply and sewerage system

Prepare to print

Reconstruction of Qabala city's drinking water supply and sewerage system

Client: "Azersu" OJSC, Azerbaijan                                

Project area – 1 435 HA
Population  - 30 000 inhabitants for projected year. 

Performed services:

  • Engineering survey services (topography, geology); hydraulic modelling, simulations etc. via Bentley SewerGEMS and WaterGEMS;
  • Development of design estimates according to SNiP and AzDTN standards;
  • Preparation of BOQ, technical specifications, development of arrangement of construction project (POS);
  • Environmental impact assessment;
  • Provision of relevant data and documentation required;
  • Obtaining of agreements and opinions with relevant authorities.

Designed scope:

  • Water-supply network - 124 km;                                                    
  • Potable water pump station - 1 un.;
  • 4 x 1000 m3 water reservoirs;      
  • Sewerage network - 120 km;
  • Sewage collector (D=1000) - 9.1 km.